Video and sound production - Excersizes

8/30/23 - 9/6/23 (Week 1)
Jessica Tjoe / 0361482
Video and sound production/ BDCM/ Institute of Innovation and Technology |
Exercises







Week 1

Excersises
 
During the first week We had to put together 2 short 30 minute commercials. Each with with varying tastes in comedy. The First video was a mint commercial, I secretly had a lot of fun adding the saxophone meme sound and record scratch that I got off meme soundboard. 

The second one is a doritos ad. And I will admit it was one of the most nerve wrecking moments I had in this class. So much so that I couldn't finish it. It was mainly because during the first class we didn't have my headphones and I heard babies screaming everywhere, It gave me major anxiety attacks to be honest so I finished it at home.

Figure 1.0: Putting together the mint cm process (9/22/23)



Week 2

 We learned about framing and story boards. We watched 3 different commercials with different angles and shots. We had to identify each one and complete an exersize where we film shots of it on our phones. 

The shot sizes that were shown are;

1. Extreme wide shot
2.Wide shot
3.Medium wide shot
4.Medium shot
5.Medium close-up shot
6.Close-up shot
7.Extreme close-up shot


we were spilt into pairs and took the shots with our phones. You can view the shots in the drive provided below.

 

Week 3

The second one was a 35 second student recreation of Lailin, a short film about a Thai girl living in Sapporo, Japan. We had to cut and put together the clips along with the sound effects and correct chat bubble. 


Week 4

This week we submitted our munich video after we dubbed it and pitch corrected it to match the character. I had to lower the pitch on the male characters compared to the little girl in the scene.

This was also when we were assigned our tiktok/insta reel project. You can view the blog specifically for this project HERE. 

Week 6 

We colour corrected the footage from the project 2 shoot. By using Lumetri colours we shifted the tints and shades to fit each the scene. Once you're done with that import all your files into premier pro


Week 9 

In this excersize we arranged a bunch of stop motion frames and edited it in after effects. First load it into Premier pro and go to prefrences > timeline then change still image duration: 5 seconds to 2-5 frames. We then loaded after effects and edited it from there. 




Week 10

We formed groups to make a short stop motion film, We made a film called Night of the Living burger. A horror story where a burger came to life and started eating everyone and everything around it. We had a blast filming everything and it was a fun experience over all. 

-End of Blog-

Comments

Popular posts from this blog

Information Design - Exercise 1

Information design - Project 1 & 2

Game Art - Art bible - Final Compilation